blob: 89e53dfee3d7d96e56b5a7525877d7d712313328 [file] [log] [blame]
<?xml version="1.0" encoding="UTF-8"?>
<org.eclipse.epf.uma:ContentDescription xmi:version="2.0"
xmlns:xmi="http://www.omg.org/XMI" xmlns:org.eclipse.epf.uma="http://www.eclipse.org/epf/uma/1.0.5/uma.ecore"
xmlns:epf="http://www.eclipse.org/epf" epf:version="1.5.0" xmi:id="-w7sImtXWkf4HDXdUWjRsUg"
name="new_guideline,_fnZj0NVXEdqy9sbRhejO5Q" guid="-w7sImtXWkf4HDXdUWjRsUg" authors="Chris Sibbald"
changeDate="2007-02-26T10:52:05.226-0800" changeDescription="Moved content from previous concept:change request to this guideline and updated in accordance with discussion from April 18, 2006 telecon."
version="0.2">
<mainDescription>&lt;h3>&#xD;
Background&#xD;
&lt;/h3>&#xD;
&lt;p>&#xD;
Change requests typically have a lifecycle. They are raised,&amp;nbsp;reviewed, accepted or rejected, implemented, verified&#xD;
and closed. These states define the status of the change request at a particular point in time and represent critical&#xD;
information for tracking progress. Other sets of states are possible.&#xD;
&lt;/p>&#xD;
&lt;p>&#xD;
During review of a change request, the goal&amp;nbsp;is to assess the&amp;nbsp;technical, cost, and schedule impact&#xD;
of&amp;nbsp;implementing the change.&amp;nbsp; The technical impact&amp;nbsp;assessment includes&amp;nbsp;the determination of&#xD;
which&amp;nbsp;work products&amp;nbsp;are affected and an estimate of the level of effort required to change and verify all&#xD;
affected artifacts. This information becomes the basis of the cost and schedule impact assessments and, ultimately,&#xD;
whether the change request will be accepted or rejected.&#xD;
&lt;/p>&#xD;
&lt;p>&#xD;
If accepted, the implementation and verification of the change request will be assigned to an iteration in the same&#xD;
manner as any other work item.&#xD;
&lt;/p>&#xD;
&lt;p>&#xD;
The&amp;nbsp;current process uses the &lt;a class=&quot;elementLinkWithType&quot; href=&quot;./../../../openup/workproducts/work_items_list_39D03CC8.html&quot; guid=&quot;_rGNWsCbSEdqh1LYUOGRh2A&quot;>Artifact: Work Items List&lt;/a> to capture, prioritize, and track the change requests&#xD;
using the attributes defined for that artifact.&#xD;
&lt;/p>&#xD;
&lt;h3>&#xD;
Submitting Change Requests&#xD;
&lt;/h3>&#xD;
&lt;p>&#xD;
When submitting a change request provide as much information as possible to enable a speedy review and&#xD;
disposition.&amp;nbsp; As a minimum, all change requests should include the following information:&#xD;
&lt;/p>&#xD;
&lt;ul>&#xD;
&lt;li>&#xD;
&lt;strong>ID&lt;/strong> - a unique identifier for the change request to simplify tracking.&amp;nbsp; If you are using some&#xD;
form of change tracking tool the tool will assign a unique ID.&#xD;
&lt;/li>&#xD;
&lt;li>&#xD;
&lt;strong>Brief Description&lt;/strong>&amp;nbsp;- a name that summarizes the change request&#xD;
&lt;/li>&#xD;
&lt;li>&#xD;
&lt;strong>Detailed Description&lt;/strong> - A detailed description of the change request.&amp;nbsp; For a defect, if you&#xD;
can provide information that will help reproduce the defect please do so.&amp;nbsp; For an enhancement request, provide&#xD;
a rationale for the request.&#xD;
&lt;/li>&#xD;
&lt;li>&#xD;
&lt;strong>Affected Item&lt;/strong>&amp;nbsp;- the affected artifact and version.&#xD;
&lt;/li>&#xD;
&lt;li>&#xD;
&lt;strong>Severity&lt;/strong> - how severe is this issue (show stopper, nice to have, etc.).&#xD;
&lt;/li>&#xD;
&lt;li>&#xD;
&lt;strong>Priority&lt;/strong> - how important it is this request in your opinion.&#xD;
&lt;/li>&#xD;
&lt;/ul>&#xD;
&lt;p>&#xD;
Depending upon the system you are using, the names of these data elements may differ.&amp;nbsp; However, this information&#xD;
is required, in one form or another, to permit a speedy review and disposition of the change request.&#xD;
&lt;/p>&lt;br />&#xD;
&lt;br />&#xD;
&lt;br /></mainDescription>