| <mainDescription><p>
 |
| The estimated work remaining in the sprint is calculated daily and graphed, resulting in a <a class="elementLink"
 |
| href="./../../Scrum/workproducts/sprint_burndown_chart_F647C347.html" guid="_YzmSIF8sEd22Gu98eFOlrQ">Sprint Burndown
 |
| Chart</a> The vertical axis displays the hours of effort remaining for the Sprint.&nbsp; The horizontal axis displays
 |
| the days of the Sprint.&nbsp; The burndown is supposed to be shown by the line of descent from the start of the Sprint
 |
| with the starting hours, down to the end of the Sprint with no hours remaining.&nbsp;
 |
| </p>
 |
| <p>
 |
| <img height="300" alt="" src="./resources/sprintburndown.jpg" width="400" />
 |
| </p>
 |
| <p>
 |
| The team does its best to pull the right amount of work into the sprint but sometimes too much or too little work is
 |
| pulled in during the <a class="elementLink" href="./../../Scrum/tasks/sprint_planning_meeting_9F0B8F28.html"
 |
| guid="_4gCKAOF9Edyp34pwdTOSVQ">Sprint Planning Meeting</a> in this case the team needs to add or remove tasks. In the
 |
| above sprint burndown chart you can see that the team had pulled in too much work initially and still had nearly 600
 |
| hours to go on 5/16/02. In this case the <a class="elementLink" href="./../../Scrum/roles/product_owner_10E7BD3.html"
 |
| guid="_QcnRMOF5Edyp34pwdTOSVQ">Product Owner</a> was consulted and it was agreed to remove some work from the sprint,
 |
| which resulted in the big drop on the chart between 5/16/02 (619 hours) and 5/17/02. From there the team made good
 |
| consistent progress and finished the sprint successfully.
 |
| </p>
 |
| <p>
 |
| <br />
 |
| &nbsp;
 |
| </p></mainDescription> |
| <purpose>Used by the team to gauge how well the Sprint is going.</purpose> |