| <?xml version="1.0" encoding="UTF-8"?> |
| <org.eclipse.epf.uma:ContentDescription xmi:version="2.0" |
| xmlns:xmi="http://www.omg.org/XMI" xmlns:org.eclipse.epf.uma="http://www.eclipse.org/epf/uma/1.0.5/uma.ecore" |
| xmlns:epf="http://www.eclipse.org/epf" epf:version="1.5.0" xmi:id="-B-d2Wl0Vyk_-I-RwtKzhKQ" |
| name="new_supporting_material,_lC260PVhEdyMdecrgpMbRg" guid="-B-d2Wl0Vyk_-I-RwtKzhKQ" |
| changeDate="2008-03-18T23:08:42.078-0400"> |
| <copyrightStatement href="uma://_6Ab_EOF4Edyp34pwdTOSVQ#_4kVeYOGBEdyp34pwdTOSVQ"/> |
| <mainDescription><p>
 |
| With Scrum, projects progress via a series of month-long iterations called <em>sprints</em>.
 |
| </p>
 |
| <p>
 |
| Scrum is ideally suited for projects with rapidly changing or highly emergent requirements. The work to be done on a
 |
| Scrum project is listed in the Product Backlog, which is a list of all desired changes to the product. At the start of
 |
| each sprint a Sprint Planning Meeting is held during which the Product Owner prioritizes the Product Backlog and the
 |
| Scrum Team selects the tasks they can complete during the coming Sprint. These tasks are then moved from the Product
 |
| Backlog to the Sprint Backlog.
 |
| </p>
 |
| <p>
 |
| Each day during the sprint conducts a brief daily meeting called the Daily Scrum, which helps the team stay on track.
 |
| </p>
 |
| <p>
 |
| At the end of each sprint the team demonstrates the completed functionality at a Sprint Review Meeting.
 |
| </p>
 |
| <p>
 |
| Graphically, Scrum looks something like this:<a class="elementLink"
 |
| href="./../../../Scrum/tasks/the_daily_scrum_C8FB7908.html" guid="_oSM0AOF-Edyp34pwdTOSVQ">The Daily Scrum</a>
 |
| </p>
 |
| <p>
 |
| <img height="371" alt="Scrum Overview" src="./resources/ScrumLargeLabelled.png" width="799" usemap="#map" /> <map
 |
| id="Map" name="Map">
 |
| <area shape="rect" coords="62,96,168,174" href="./../../../Scrum/workproducts/product_backlog_68345C16.html"
 |
| guid="_OZIPIOF8Edyp34pwdTOSVQ" />
 |
| <area shape="rect" coords="212,95,319,175" href="./../../../Scrum/workproducts/sprint_backlog_7A5B8A37.html"
 |
| guid="_Q5Ki8OF8Edyp34pwdTOSVQ" />
 |
| <area shape="rect" coords="234,-2,362,69" href="./../../../Scrum/tasks/the_daily_scrum_C8FB7908.html"
 |
| guid="_oSM0AOF-Edyp34pwdTOSVQ" />
 |
| <area shape="rect" coords="607,73,756,196"
 |
| href="./../../../Scrum/workproducts/potentially_shippable_product_incremement_69E6418C.html"
 |
| guid="__uNYkPVgEdyMdecrgpMbRg" />
 |
| </map>
 |
| </p></mainDescription> |
| </org.eclipse.epf.uma:ContentDescription> |