| <sections xmi:id="_U7JSUAbNEdy1uLAzgK8btg" name="Have Work Items been described without ambiguity?" |
| guid="_U7JSUAbNEdy1uLAzgK8btg"> |
| <sectionDescription><p>
 |
| Does each Work Item have a name and clear description? This helps the team estimate Work Item size. If necessary,
 |
| include links on the Work Items List to reference material where further detail is available.
 |
| </p></sectionDescription> |
| </sections> |
| <sections xmi:id="_dL2nwAVuEdy3F_fZDaPZVA" name="Have Work Items been prioritized?" |
| guid="_dL2nwAVuEdy3F_fZDaPZVA"> |
| <sectionDescription><p align="left">
 |
| Has every Work Item been prioritized? This helps the team select the Work Items to be delivered in each iteration.
 |
| </p></sectionDescription> |
| </sections> |
| <sections xmi:id="_bF3LoAVuEdy3F_fZDaPZVA" name="Have Work Items been estimated?" |
| guid="_bF3LoAVuEdy3F_fZDaPZVA"> |
| <sectionDescription><p align="left">
 |
| Every Work Item should be estimated. This will help the team to select the Work Items to be delivered in each
 |
| iteration.
 |
| </p></sectionDescription> |
| </sections> |
| <sections xmi:id="_O7VloAbFEdy1uLAzgK8btg" name="Are the Work Items being tracked?" |
| guid="_O7VloAbFEdy1uLAzgK8btg"> |
| <sectionDescription><p align="left">
 |
| Does every Work Item have a state attribute? This helps the team track its development project.&nbsp;
 |
| </p></sectionDescription> |
| </sections> |
| <sections xmi:id="_tENnkAVuEdy3F_fZDaPZVA" name="Are scheduled Work Items the right size?" |
| guid="_tENnkAVuEdy3F_fZDaPZVA"> |
| <sectionDescription>If a Work Item is scheduled for an iteration, then it should be broken down into Work Items that can be completed in a
 |
| reasonable timeframe, from a few hours to a few days (micro-increments). This will help&nbsp;the team be more productive
 |
| and produce&nbsp;more detailed effort estimates. <br align="left" />
 |