| <?xml version="1.0" encoding="UTF-8"?> |
| <org.eclipse.epf.uma:ContentDescription xmi:version="2.0" |
| xmlns:xmi="http://www.omg.org/XMI" xmlns:org.eclipse.epf.uma="http://www.eclipse.org/epf/uma/1.0.5/uma.ecore" |
| xmlns:epf="http://www.eclipse.org/epf" epf:version="1.5.0" xmlns:rmc="http://www.ibm.com/rmc" |
| rmc:version="7.5.0" xmi:id="-4a1QxeLdn2OKx5_Lft8tBA" |
| name="how_to_adopt,_ERIDQOMPEdyM47cGD2jiaQ" guid="-4a1QxeLdn2OKx5_Lft8tBA" changeDate="2009-07-15T16:22:23.866-0700" |
| version="7.2.0"> |
| <mainDescription><h3>
 |
| Getting started&nbsp;
 |
| </h3>
 |
| <p>
 |
| Release&nbsp;planning is concerned with creating a strategic project plan (where the internal and external releases of
 |
| the project are identified), and tactical iteration plans for individual iterations within releases. It aims at
 |
| creating the right level of granularity for each purpose, so that the investment in planning is held to a minimum.
 |
| </p>
 |
| <p>
 |
| Begin by understanding the high-level features that the system is expected to possess. These are the system's main
 |
| themes or services, and they are typically described or listed in a vision document. They serve to set goals and
 |
| expectations, both internally and externally, and they guide and constrain the iteration planning.
 |
| </p>
 |
| <p>
 |
| The project plan is coarser-grained than iteration plans. As <a class="elementLinkWithUserText"
 |
| href="./../../../core.mgmt.common.base/guidances/supportingmaterials/references.mgmt_D80619F3.html#LEF07"
 |
| guid="_JlTPUM6aEdyuBO4ZIzcyig">[LEF07]</a> notes, a system can be described with a list of 25-50 features, calibrated
 |
| to the relative complexity of that system. Iteration plans, on the other hand, are described in terms of individual
 |
| user stories, use cases and scenarios, or other work items that will be&nbsp;developed in each iteration.
 |
| </p>
 |
| <p>
 |
| As early in the project as possible, ideally as part of the kick-off of a new project, hold a planning session (with
 |
| the whole team and the stakeholders of the system) during which the initial project plan is established.
 |
| </p>
 |
| <p>
 |
| Update the project plan as often as necessary to reflect changing business priorities and needs.
 |
| </p>
 |
| <p>
 |
| Iteration plans help to estimate and track individual iterations. For each iteration, its plan is created just-in-time,
 |
| based on the currently highest prioritized work items in the product backlog.
 |
| </p>
 |
| <h3>
 |
| Common pitfalls
 |
| </h3>
 |
| <p>
 |
| One of the biggest challenges with agile planning is to resist pressure from upper management if they require to see
 |
| complete plans up-front in the project. This is best avoided by involving them in the planning process, and by
 |
| demonstrating the value of empirical planning by making the process transparent and open (to the organization and the
 |
| project's stakeholders) so that they can easily follow the progress of the project.
 |
| </p>
 |
| <p>
 |
| It can be difficult to find the right level of granularity for the features of a given system. With too many features,
 |
| the planning process becomes tedious and error-prone, and will work counter to the intent.
 |
| </p></mainDescription> |