| <?xml version="1.0" encoding="UTF-8"?> |
| <org.eclipse.epf.uma:ProcessDescription xmi:version="2.0" |
| xmlns:xmi="http://www.omg.org/XMI" xmlns:org.eclipse.epf.uma="http://www.eclipse.org/epf/uma/1.0.5/uma.ecore" |
| xmlns:rmc="http://www.ibm.com/rmc" rmc:version="7.5.0" xmlns:epf="http://www.eclipse.org/epf" |
| epf:version="1.5.0" xmi:id="-aXudKqi6rjimd3UsF0smZA" |
| name="ongoing_tasks,__ZInMdOEEdyqlogshP8l4g" guid="-aXudKqi6rjimd3UsF0smZA" version="7.2.0"> |
| <mainDescription><p>
 |
| This activity includes a task for requesting changes. This task may occur any time during the lifecycle in response to
 |
| an observed defect, a desired enhancement, or a change request. It is not planned, which means that it does not appear
 |
| as a scheduled activity on the project plan, iteration plan, or work items list. Nevertheless, it is a critical
 |
| activity that must be performed to ensure project success, because your environment is not static.
 |
| </p>
 |
| <p>
 |
| Any role may perform this task, however the most common sources of <a class="elementLink" href="./../../practice.tech.continuous_integration.base/guidances/concepts/change_requests_AD4868FE.html" guid="_6jdvECb3Edqh1LYUOGRh2A">Change Requests</a> are stakeholders (enhancement requests and change requests) and
 |
| testers (defect reports).
 |
| </p></mainDescription> |
| </org.eclipse.epf.uma:ProcessDescription> |