| * Copyright (c) 2000, 2004 IBM Corporation and others. |
| * All rights reserved. This program and the accompanying materials |
| * are made available under the terms of the Common Public License v1.0 |
| * which accompanies this distribution, and is available at |
| * http://www.eclipse.org/legal/cpl-v10.html |
| * |
| * Contributors: |
| * IBM Corporation - initial API and implementation |
| *******************************************************************************/ |
| package org.eclipse.jface.dialogs; |
| |
| import org.eclipse.swt.SWT; |
| import org.eclipse.swt.custom.StackLayout; |
| import org.eclipse.swt.widgets.Composite; |
| import org.eclipse.swt.widgets.ProgressBar; |
| |
| /** |
| * A control for showing progress feedback for a long running operation. This |
| * control supports both determinate and indeterminate SWT progress bars. For |
| * indeterminate progress, we don't have to know the total amount of work in |
| * advance and no <code>worked</code> method needs to be called. |
| */ |
| public class ProgressIndicator extends Composite { |
| private final static int PROGRESS_MAX = 1000; // value to use for max in |
| |
| // progress bar |
| private boolean animated = true; |
| |
| private StackLayout layout; |
| |
| private ProgressBar determinateProgressBar; |
| |
| private ProgressBar indeterminateProgressBar; |
| |
| private double totalWork; |
| |
| private double sumWorked; |
| |
| /** |
| * Create a ProgressIndicator as a child under the given parent. |
| * |
| * @param parent |
| * The widgets parent |
| */ |
| public ProgressIndicator(Composite parent) { |
| super(parent, SWT.NULL); |
| determinateProgressBar = new ProgressBar(this, SWT.HORIZONTAL); |
| indeterminateProgressBar = new ProgressBar(this, SWT.HORIZONTAL |
| | SWT.INDETERMINATE); |
| layout = new StackLayout(); |
| setLayout(layout); |
| } |
| |
| /** |
| * Initialize the progress bar to be animated. |
| */ |
| public void beginAnimatedTask() { |
| done(); |
| layout.topControl = indeterminateProgressBar; |
| layout(); |
| animated = true; |
| } |
| |
| /** |
| * Initialize the progress bar. |
| * |
| * @param max |
| * The maximum value. |
| */ |
| public void beginTask(int max) { |
| done(); |
| this.totalWork = max; |
| this.sumWorked = 0; |
| determinateProgressBar.setMinimum(0); |
| determinateProgressBar.setMaximum(PROGRESS_MAX); |
| determinateProgressBar.setSelection(0); |
| layout.topControl = determinateProgressBar; |
| layout(); |
| animated = false; |
| } |
| |
| /** |
| * Progress is done. |
| */ |
| public void done() { |
| if (!animated) { |
| determinateProgressBar.setMinimum(0); |
| determinateProgressBar.setMaximum(0); |
| determinateProgressBar.setSelection(0); |
| } |
| layout.topControl = null; |
| layout(); |
| } |
| |
| /** |
| * Moves the progress indicator to the end. |
| */ |
| public void sendRemainingWork() { |
| worked(totalWork - sumWorked); |
| } |
| |
| /** |
| * Moves the progress indicator by the given amount of work units |
| * @param work the amount of work to increment by. |
| */ |
| public void worked(double work) { |
| if (work == 0 || animated) { |
| return; |
| } |
| sumWorked += work; |
| if (sumWorked > totalWork) { |
| sumWorked = totalWork; |
| } |
| if (sumWorked < 0) { |
| sumWorked = 0; |
| } |
| int value = (int) (sumWorked / totalWork * PROGRESS_MAX); |
| if (determinateProgressBar.getSelection() < value) { |
| determinateProgressBar.setSelection(value); |
| } |
| } |
| } |