blob: 52b47ea130c1ad3c115b49e54da92187d2ce472e [file] [log] [blame]
/*******************************************************************************
* Copyright (c) 2007, 2008 IBM Corporation and others.
* All rights reserved. This program and the accompanying materials
* are made available under the terms of the Eclipse Public License v1.0
* which accompanies this distribution, and is available at
* http://www.eclipse.org/legal/epl-v10.html
*
* Contributors:
* IBM Corporation - initial API and implementation
*******************************************************************************/
package org.eclipse.wst.validation.ui.internal;
import java.util.Map;
import java.util.Set;
import org.eclipse.core.resources.IProject;
import org.eclipse.core.resources.IResource;
import org.eclipse.core.resources.WorkspaceJob;
import org.eclipse.core.runtime.CoreException;
import org.eclipse.core.runtime.IProgressMonitor;
import org.eclipse.core.runtime.IStatus;
import org.eclipse.core.runtime.Status;
import org.eclipse.core.runtime.jobs.MultiRule;
import org.eclipse.swt.widgets.Display;
import org.eclipse.wst.validation.ValidationResult;
import org.eclipse.wst.validation.internal.ValOperation;
import org.eclipse.wst.validation.internal.ValType;
import org.eclipse.wst.validation.internal.ValidationRunner;
import org.eclipse.wst.validation.ui.internal.dialog.ResultsDialog;
/**
* Run a manual validation.
* @author karasiuk
*
*/
public class ManualValidationRunner extends WorkspaceJob {
private Map<IProject, Set<IResource>> _projects;
private ValType _valType;
private boolean _showResults;
/**
* Validate the selected projects and/or resources.
*
* @param projects
* The selected projects. The key is an IProject and the value is
* the Set of IResources that were selected. Often this will be
* every resource in the project.
*
* @param isManual
* Is this a manual validation?
*
* @param isBuild
* Is this a build based validation?
*
* @param showResults
* When the validation is finished, show the results in a dialog box.
*/
public static void validate(Map<IProject, Set<IResource>> projects, ValType valType, boolean showResults){
ManualValidationRunner me = new ManualValidationRunner(projects, valType, showResults);
//TODO optimize this, I don't like the idea of validators having to lock the entire project
Set<IProject> keys = projects.keySet();
IProject[] projectArray = new IProject[keys.size()];
keys.toArray(projectArray);
if (projectArray.length == 1)me.setRule(projectArray[0]);
else {
me.setRule(MultiRule.combine(projectArray));
}
me.schedule();
}
private ManualValidationRunner(Map<IProject, Set<IResource>> projects, ValType valType, boolean showResults){
super(ValUIMessages.Validation);
_projects = projects;
_valType = valType;
_showResults = showResults;
}
public IStatus runInWorkspace(IProgressMonitor monitor) throws CoreException {
long start = System.currentTimeMillis();
final ValOperation vo = ValidationRunner.validate(_projects, _valType, monitor, false);
final long time = System.currentTimeMillis() - start;
int resourceCount = 0;
for (Set s : _projects.values())resourceCount += s.size();
final int finalResourceCount = resourceCount;
if (vo.getResult().isCanceled())return Status.CANCEL_STATUS;
if (_showResults){
Display display = Display.getDefault();
Runnable run = new Runnable(){
public void run() {
ValidationResult vr = vo.getResult();
ResultsDialog rd = new ResultsDialog(null, vr, time, finalResourceCount);
rd.open();
}
};
display.asyncExec(run);
}
return Status.OK_STATUS;
}
}