| /** |
| * <copyright> |
| * </copyright> |
| * |
| * $Id: Baseline.java,v 1.1 2008/01/15 08:52:45 jtham Exp $ |
| */ |
| package org.eclipse.epf.msproject; |
| |
| import java.math.BigDecimal; |
| import java.math.BigInteger; |
| |
| import org.eclipse.emf.common.util.EList; |
| import org.eclipse.emf.ecore.EObject; |
| |
| /** |
| * <!-- begin-user-doc --> |
| * A representation of the model object '<em><b>Baseline</b></em>'. |
| * <!-- end-user-doc --> |
| * |
| * <p> |
| * The following features are supported: |
| * <ul> |
| * <li>{@link org.eclipse.epf.msproject.Baseline#getTimephasedData <em>Timephased Data</em>}</li> |
| * <li>{@link org.eclipse.epf.msproject.Baseline#getNumber <em>Number</em>}</li> |
| * <li>{@link org.eclipse.epf.msproject.Baseline#isInterim <em>Interim</em>}</li> |
| * <li>{@link org.eclipse.epf.msproject.Baseline#getStart <em>Start</em>}</li> |
| * <li>{@link org.eclipse.epf.msproject.Baseline#getFinish <em>Finish</em>}</li> |
| * <li>{@link org.eclipse.epf.msproject.Baseline#getDuration <em>Duration</em>}</li> |
| * <li>{@link org.eclipse.epf.msproject.Baseline#getDurationFormat <em>Duration Format</em>}</li> |
| * <li>{@link org.eclipse.epf.msproject.Baseline#isEstimatedDuration <em>Estimated Duration</em>}</li> |
| * <li>{@link org.eclipse.epf.msproject.Baseline#getWork <em>Work</em>}</li> |
| * <li>{@link org.eclipse.epf.msproject.Baseline#getCost <em>Cost</em>}</li> |
| * <li>{@link org.eclipse.epf.msproject.Baseline#getBCWS <em>BCWS</em>}</li> |
| * <li>{@link org.eclipse.epf.msproject.Baseline#getBCWP <em>BCWP</em>}</li> |
| * </ul> |
| * </p> |
| * |
| * @see org.eclipse.epf.msproject.MsprojectPackage#getBaseline() |
| * @model extendedMetaData="name='Baseline_._type' kind='elementOnly'" |
| * @generated |
| */ |
| public interface Baseline extends EObject { |
| /** |
| * Returns the value of the '<em><b>Timephased Data</b></em>' containment reference list. |
| * The list contents are of type {@link org.eclipse.epf.msproject.TimephasedDataType}. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * <!-- begin-model-doc --> |
| * The time phased data block associated with the task baseline. |
| * |
| * <!-- end-model-doc --> |
| * @return the value of the '<em>Timephased Data</em>' containment reference list. |
| * @see org.eclipse.epf.msproject.MsprojectPackage#getBaseline_TimephasedData() |
| * @model type="org.eclipse.epf.msproject.TimephasedDataType" containment="true" resolveProxies="false" |
| * extendedMetaData="kind='element' name='TimephasedData' namespace='##targetNamespace'" |
| * @generated |
| */ |
| EList getTimephasedData(); |
| |
| /** |
| * Returns the value of the '<em><b>Number</b></em>' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * <!-- begin-model-doc --> |
| * The unique number of the baseline data record. |
| * |
| * <!-- end-model-doc --> |
| * @return the value of the '<em>Number</em>' attribute. |
| * @see #setNumber(BigInteger) |
| * @see org.eclipse.epf.msproject.MsprojectPackage#getBaseline_Number() |
| * @model unique="false" dataType="org.eclipse.emf.ecore.xml.type.Integer" |
| * extendedMetaData="kind='element' name='Number' namespace='##targetNamespace'" |
| * @generated |
| */ |
| BigInteger getNumber(); |
| |
| /** |
| * Sets the value of the '{@link org.eclipse.epf.msproject.Baseline#getNumber <em>Number</em>}' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @param value the new value of the '<em>Number</em>' attribute. |
| * @see #getNumber() |
| * @generated |
| */ |
| void setNumber(BigInteger value); |
| |
| /** |
| * Returns the value of the '<em><b>Interim</b></em>' attribute. |
| * The default value is <code>"false"</code>. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * <!-- begin-model-doc --> |
| * Whether this is an Interim Baseline. |
| * |
| * <!-- end-model-doc --> |
| * @return the value of the '<em>Interim</em>' attribute. |
| * @see #isSetInterim() |
| * @see #unsetInterim() |
| * @see #setInterim(boolean) |
| * @see org.eclipse.epf.msproject.MsprojectPackage#getBaseline_Interim() |
| * @model default="false" unique="false" unsettable="true" dataType="org.eclipse.emf.ecore.xml.type.Boolean" |
| * extendedMetaData="kind='element' name='Interim' namespace='##targetNamespace'" |
| * @generated |
| */ |
| boolean isInterim(); |
| |
| /** |
| * Sets the value of the '{@link org.eclipse.epf.msproject.Baseline#isInterim <em>Interim</em>}' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @param value the new value of the '<em>Interim</em>' attribute. |
| * @see #isSetInterim() |
| * @see #unsetInterim() |
| * @see #isInterim() |
| * @generated |
| */ |
| void setInterim(boolean value); |
| |
| /** |
| * Unsets the value of the '{@link org.eclipse.epf.msproject.Baseline#isInterim <em>Interim</em>}' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @see #isSetInterim() |
| * @see #isInterim() |
| * @see #setInterim(boolean) |
| * @generated |
| */ |
| void unsetInterim(); |
| |
| /** |
| * Returns whether the value of the '{@link org.eclipse.epf.msproject.Baseline#isInterim <em>Interim</em>}' attribute is set. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @return whether the value of the '<em>Interim</em>' attribute is set. |
| * @see #unsetInterim() |
| * @see #isInterim() |
| * @see #setInterim(boolean) |
| * @generated |
| */ |
| boolean isSetInterim(); |
| |
| /** |
| * Returns the value of the '<em><b>Start</b></em>' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * <!-- begin-model-doc --> |
| * The scheduled start date of the task when the baseline was saved. |
| * |
| * <!-- end-model-doc --> |
| * @return the value of the '<em>Start</em>' attribute. |
| * @see #setStart(Object) |
| * @see org.eclipse.epf.msproject.MsprojectPackage#getBaseline_Start() |
| * @model unique="false" dataType="org.eclipse.emf.ecore.xml.type.DateTime" |
| * extendedMetaData="kind='element' name='Start' namespace='##targetNamespace'" |
| * @generated |
| */ |
| Object getStart(); |
| |
| /** |
| * Sets the value of the '{@link org.eclipse.epf.msproject.Baseline#getStart <em>Start</em>}' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @param value the new value of the '<em>Start</em>' attribute. |
| * @see #getStart() |
| * @generated |
| */ |
| void setStart(Object value); |
| |
| /** |
| * Returns the value of the '<em><b>Finish</b></em>' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * <!-- begin-model-doc --> |
| * The scheduled finish date of the task when the baseline was saved. |
| * |
| * <!-- end-model-doc --> |
| * @return the value of the '<em>Finish</em>' attribute. |
| * @see #setFinish(Object) |
| * @see org.eclipse.epf.msproject.MsprojectPackage#getBaseline_Finish() |
| * @model unique="false" dataType="org.eclipse.emf.ecore.xml.type.DateTime" |
| * extendedMetaData="kind='element' name='Finish' namespace='##targetNamespace'" |
| * @generated |
| */ |
| Object getFinish(); |
| |
| /** |
| * Sets the value of the '{@link org.eclipse.epf.msproject.Baseline#getFinish <em>Finish</em>}' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @param value the new value of the '<em>Finish</em>' attribute. |
| * @see #getFinish() |
| * @generated |
| */ |
| void setFinish(Object value); |
| |
| /** |
| * Returns the value of the '<em><b>Duration</b></em>' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * <!-- begin-model-doc --> |
| * The scheduled duration of the task when the baseline was saved. |
| * |
| * <!-- end-model-doc --> |
| * @return the value of the '<em>Duration</em>' attribute. |
| * @see #setDuration(Object) |
| * @see org.eclipse.epf.msproject.MsprojectPackage#getBaseline_Duration() |
| * @model unique="false" dataType="org.eclipse.emf.ecore.xml.type.Duration" |
| * extendedMetaData="kind='element' name='Duration' namespace='##targetNamespace'" |
| * @generated |
| */ |
| Object getDuration(); |
| |
| /** |
| * Sets the value of the '{@link org.eclipse.epf.msproject.Baseline#getDuration <em>Duration</em>}' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @param value the new value of the '<em>Duration</em>' attribute. |
| * @see #getDuration() |
| * @generated |
| */ |
| void setDuration(Object value); |
| |
| /** |
| * Returns the value of the '<em><b>Duration Format</b></em>' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * <!-- begin-model-doc --> |
| * The format for expressing the Duration of the Task baseline. |
| * Values are: 3=m, 4=em, 5=h, 6=eh, 7=d, 8=ed, 9=w, 10=ew, 11=mo, 12=emo, 19=%, 20=e%, |
| * 21=null, 35=m?, 36=em?, 37=h?, 38=eh?, 39=d?, 40=ed?, 41=w?, 42=ew?, 43=mo?, 44=emo?, |
| * 51=%?, 52=e%? and 53=null. |
| * |
| * <!-- end-model-doc --> |
| * @return the value of the '<em>Duration Format</em>' attribute. |
| * @see #setDurationFormat(BigInteger) |
| * @see org.eclipse.epf.msproject.MsprojectPackage#getBaseline_DurationFormat() |
| * @model unique="false" dataType="org.eclipse.epf.msproject.DurationFormatType1" |
| * extendedMetaData="kind='element' name='DurationFormat' namespace='##targetNamespace'" |
| * @generated |
| */ |
| BigInteger getDurationFormat(); |
| |
| /** |
| * Sets the value of the '{@link org.eclipse.epf.msproject.Baseline#getDurationFormat <em>Duration Format</em>}' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @param value the new value of the '<em>Duration Format</em>' attribute. |
| * @see #getDurationFormat() |
| * @generated |
| */ |
| void setDurationFormat(BigInteger value); |
| |
| /** |
| * Returns the value of the '<em><b>Estimated Duration</b></em>' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * <!-- begin-model-doc --> |
| * Whether the baseline duration of the task was estimated. |
| * |
| * <!-- end-model-doc --> |
| * @return the value of the '<em>Estimated Duration</em>' attribute. |
| * @see #isSetEstimatedDuration() |
| * @see #unsetEstimatedDuration() |
| * @see #setEstimatedDuration(boolean) |
| * @see org.eclipse.epf.msproject.MsprojectPackage#getBaseline_EstimatedDuration() |
| * @model unique="false" unsettable="true" dataType="org.eclipse.emf.ecore.xml.type.Boolean" |
| * extendedMetaData="kind='element' name='EstimatedDuration' namespace='##targetNamespace'" |
| * @generated |
| */ |
| boolean isEstimatedDuration(); |
| |
| /** |
| * Sets the value of the '{@link org.eclipse.epf.msproject.Baseline#isEstimatedDuration <em>Estimated Duration</em>}' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @param value the new value of the '<em>Estimated Duration</em>' attribute. |
| * @see #isSetEstimatedDuration() |
| * @see #unsetEstimatedDuration() |
| * @see #isEstimatedDuration() |
| * @generated |
| */ |
| void setEstimatedDuration(boolean value); |
| |
| /** |
| * Unsets the value of the '{@link org.eclipse.epf.msproject.Baseline#isEstimatedDuration <em>Estimated Duration</em>}' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @see #isSetEstimatedDuration() |
| * @see #isEstimatedDuration() |
| * @see #setEstimatedDuration(boolean) |
| * @generated |
| */ |
| void unsetEstimatedDuration(); |
| |
| /** |
| * Returns whether the value of the '{@link org.eclipse.epf.msproject.Baseline#isEstimatedDuration <em>Estimated Duration</em>}' attribute is set. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @return whether the value of the '<em>Estimated Duration</em>' attribute is set. |
| * @see #unsetEstimatedDuration() |
| * @see #isEstimatedDuration() |
| * @see #setEstimatedDuration(boolean) |
| * @generated |
| */ |
| boolean isSetEstimatedDuration(); |
| |
| /** |
| * Returns the value of the '<em><b>Work</b></em>' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * <!-- begin-model-doc --> |
| * The scheduled work of the task when the baseline was saved. |
| * |
| * <!-- end-model-doc --> |
| * @return the value of the '<em>Work</em>' attribute. |
| * @see #setWork(Object) |
| * @see org.eclipse.epf.msproject.MsprojectPackage#getBaseline_Work() |
| * @model unique="false" dataType="org.eclipse.emf.ecore.xml.type.Duration" |
| * extendedMetaData="kind='element' name='Work' namespace='##targetNamespace'" |
| * @generated |
| */ |
| Object getWork(); |
| |
| /** |
| * Sets the value of the '{@link org.eclipse.epf.msproject.Baseline#getWork <em>Work</em>}' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @param value the new value of the '<em>Work</em>' attribute. |
| * @see #getWork() |
| * @generated |
| */ |
| void setWork(Object value); |
| |
| /** |
| * Returns the value of the '<em><b>Cost</b></em>' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * <!-- begin-model-doc --> |
| * The projected cost of the task when the baseline was saved. |
| * |
| * <!-- end-model-doc --> |
| * @return the value of the '<em>Cost</em>' attribute. |
| * @see #setCost(BigDecimal) |
| * @see org.eclipse.epf.msproject.MsprojectPackage#getBaseline_Cost() |
| * @model unique="false" dataType="org.eclipse.emf.ecore.xml.type.Decimal" |
| * extendedMetaData="kind='element' name='Cost' namespace='##targetNamespace'" |
| * @generated |
| */ |
| BigDecimal getCost(); |
| |
| /** |
| * Sets the value of the '{@link org.eclipse.epf.msproject.Baseline#getCost <em>Cost</em>}' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @param value the new value of the '<em>Cost</em>' attribute. |
| * @see #getCost() |
| * @generated |
| */ |
| void setCost(BigDecimal value); |
| |
| /** |
| * Returns the value of the '<em><b>BCWS</b></em>' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * <!-- begin-model-doc --> |
| * The budgeted cost of work scheduled for the task. |
| * |
| * <!-- end-model-doc --> |
| * @return the value of the '<em>BCWS</em>' attribute. |
| * @see #isSetBCWS() |
| * @see #unsetBCWS() |
| * @see #setBCWS(float) |
| * @see org.eclipse.epf.msproject.MsprojectPackage#getBaseline_BCWS() |
| * @model unique="false" unsettable="true" dataType="org.eclipse.emf.ecore.xml.type.Float" |
| * extendedMetaData="kind='element' name='BCWS' namespace='##targetNamespace'" |
| * @generated |
| */ |
| float getBCWS(); |
| |
| /** |
| * Sets the value of the '{@link org.eclipse.epf.msproject.Baseline#getBCWS <em>BCWS</em>}' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @param value the new value of the '<em>BCWS</em>' attribute. |
| * @see #isSetBCWS() |
| * @see #unsetBCWS() |
| * @see #getBCWS() |
| * @generated |
| */ |
| void setBCWS(float value); |
| |
| /** |
| * Unsets the value of the '{@link org.eclipse.epf.msproject.Baseline#getBCWS <em>BCWS</em>}' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @see #isSetBCWS() |
| * @see #getBCWS() |
| * @see #setBCWS(float) |
| * @generated |
| */ |
| void unsetBCWS(); |
| |
| /** |
| * Returns whether the value of the '{@link org.eclipse.epf.msproject.Baseline#getBCWS <em>BCWS</em>}' attribute is set. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @return whether the value of the '<em>BCWS</em>' attribute is set. |
| * @see #unsetBCWS() |
| * @see #getBCWS() |
| * @see #setBCWS(float) |
| * @generated |
| */ |
| boolean isSetBCWS(); |
| |
| /** |
| * Returns the value of the '<em><b>BCWP</b></em>' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * <!-- begin-model-doc --> |
| * The budgeted cost of work performed on the task to-date. |
| * |
| * <!-- end-model-doc --> |
| * @return the value of the '<em>BCWP</em>' attribute. |
| * @see #isSetBCWP() |
| * @see #unsetBCWP() |
| * @see #setBCWP(float) |
| * @see org.eclipse.epf.msproject.MsprojectPackage#getBaseline_BCWP() |
| * @model unique="false" unsettable="true" dataType="org.eclipse.emf.ecore.xml.type.Float" |
| * extendedMetaData="kind='element' name='BCWP' namespace='##targetNamespace'" |
| * @generated |
| */ |
| float getBCWP(); |
| |
| /** |
| * Sets the value of the '{@link org.eclipse.epf.msproject.Baseline#getBCWP <em>BCWP</em>}' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @param value the new value of the '<em>BCWP</em>' attribute. |
| * @see #isSetBCWP() |
| * @see #unsetBCWP() |
| * @see #getBCWP() |
| * @generated |
| */ |
| void setBCWP(float value); |
| |
| /** |
| * Unsets the value of the '{@link org.eclipse.epf.msproject.Baseline#getBCWP <em>BCWP</em>}' attribute. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @see #isSetBCWP() |
| * @see #getBCWP() |
| * @see #setBCWP(float) |
| * @generated |
| */ |
| void unsetBCWP(); |
| |
| /** |
| * Returns whether the value of the '{@link org.eclipse.epf.msproject.Baseline#getBCWP <em>BCWP</em>}' attribute is set. |
| * <!-- begin-user-doc --> |
| * <!-- end-user-doc --> |
| * @return whether the value of the '<em>BCWP</em>' attribute is set. |
| * @see #unsetBCWP() |
| * @see #getBCWP() |
| * @see #setBCWP(float) |
| * @generated |
| */ |
| boolean isSetBCWP(); |
| |
| } // Baseline |