| <org.eclipse.epf.uma:TaskDescription xmi:version="2.0" xmlns:xmi="http://www.omg.org/XMI" xmlns:org.eclipse.epf.uma="http://www.eclipse.org/epf/uma/1.0.6/uma.ecore" xmlns:epf="http://www.eclipse.org/epf" epf:version="1.5.1" xmi:id="-PPEUOk6Gija0ckrWlDdCxA" name="02_02_execute_deployment_plan,_FCK_gWzvEeCPgecPbK9bdg" guid="-PPEUOk6Gija0ckrWlDdCxA" changeDate="2012-05-30T14:11:35.736-0700" version="7.5.1"> |
| <mainDescription><p>
 |
| This task is straightforward: follow the procedures in the Deployment Plan for the rollout of a specific product
 |
| release. If the deployment plan does not exist or it is poorly constructed, this task might be much more difficult.
 |
| </p>
 |
| <p>
 |
| The main point here is that to achieve a high probability of success, the development team should have previously
 |
| developed a detailed plan that organizes and articulates all the unique instructions for deploying that particular
 |
| release. Because an experienced deployment engineer normally executes this task, they might be able to overcome any
 |
| missing deployment procedures or content. However, that is not an excuse for a development team to not develop the
 |
| plan's contents.
 |
| </p></mainDescription> |
| <sections xmi:id="_IAD2deB-EeC1y_NExchKwQ" name="Review deployment plan" guid="_IAD2deB-EeC1y_NExchKwQ"> |
| <sectionDescription>Review the contents of the deployment plan to ensure that the production environment has all the dependent components%EOL%installed and that the system is in the correct state. Also ensure that the release window is ready to be achieved.</sectionDescription> |
| </sections> |
| <sections xmi:id="_IAD2duB-EeC1y_NExchKwQ" name="Release code" guid="_IAD2duB-EeC1y_NExchKwQ"> |
| <sectionDescription><p>
 |
| When the preliminary review has been completed and the release window has started, deploy the release package into
 |
| production. Depending on the release script and the size of the package, this installation might take anywhere from a
 |
| few minutes to a few hours.
 |
| </p>
 |
| <p>
 |
| Monitor the release as the release script is run. Be prepared to terminate the script and back out the release if
 |
| significant errors are encountered.
 |
| </p></sectionDescription> |
| </sections> |
| <purpose>The purpose of this task is to ensure that the rollout is based on clear, validated, repeatable instructions and to reduce
 |
| the risk of a deployment issue.</purpose> |