| <?xml version="1.0" encoding="UTF-8"?> |
| <org.eclipse.epf.uma:ContentDescription xmi:version="2.0" |
| xmlns:xmi="http://www.omg.org/XMI" xmlns:org.eclipse.epf.uma="http://www.eclipse.org/epf/uma/1.0.4/uma.ecore" |
| xmlns:epf="http://www.eclipse.org/epf" |
| epf:version="1.2.0" xmi:id="-z4NERMW6W4_X_5DuTTXv6A" |
| name="new_checklist,_OHRDMAarEdy1uLAzgK8btg" guid="-z4NERMW6W4_X_5DuTTXv6A"> |
| <sections xmi:id="_EQJdAAa_Edy1uLAzgK8btg" name="Have you elaborated on the plan with the team?" |
| guid="_EQJdAAa_Edy1uLAzgK8btg"> |
| <sectionDescription><p> Iteration planning should not be done in isolation, and every member of the 
 |
| team should be involved. </p></sectionDescription> |
| </sections> |
| <sections xmi:id="_lmIhYAarEdy1uLAzgK8btg" name="Are iteration objectives clear?" |
| guid="_lmIhYAarEdy1uLAzgK8btg"> |
| <sectionDescription><ul>
 |
| <li> Are the objectives based on stakeholder priorities? </li>
 |
| <li> Do they help the team target what should be targeted for the iteration? 
 |
| </li>
 |
| </ul></sectionDescription> |
| </sections> |
| <sections xmi:id="_i2r4kAarEdy1uLAzgK8btg" name="Have key milestones for the iteration been identified?" |
| guid="_i2r4kAarEdy1uLAzgK8btg"> |
| <sectionDescription><p> This may include dates for iteration reviews, demonstrations (demos), and 
 |
| retrospective reviews.<br />
 |
| 
 |
| <br align="left" />
 |
| 
 |
| <br />
 |
| 
 |
| </p></sectionDescription> |
| </sections> |
| <sections xmi:id="_oKlbIAarEdy1uLAzgK8btg" name="Do the team members feel confident about their Work Item assignments?" |
| guid="_oKlbIAarEdy1uLAzgK8btg"> |
| <sectionDescription><p align="left"> Looking at results from previous iterations, does the amount 
 |
| of work selected for current iteration seem feasible? </p>
 |
| <p align="left"> If the team feels there's too much to do, discuss with stakeholders 
 |
| whether some Work Items can be scheduled for future iterations. </p></sectionDescription> |
| </sections> |
| </org.eclipse.epf.uma:ContentDescription> |