| <org.eclipse.epf.uma:ContentDescription xmi:version="2.0" xmlns:xmi="http://www.omg.org/XMI" xmlns:org.eclipse.epf.uma="http://www.eclipse.org/epf/uma/1.0.3/uma.ecore" xmi:id="-gqNN4DnROmJpgKtrdguhpg" name="new_checklist,_7BZa0DIdEduDTv4Y1akVTA" guid="-gqNN4DnROmJpgKtrdguhpg" changeDate="2006-08-22T13:38:14.915-0700"> |
| <sections xmi:id="_qO41ADIfEduDTv4Y1akVTA" name="Have all potential risks to the project been identified" guid="_qO41ADIfEduDTv4Y1akVTA"> |
| <sectionDescription>Have you identified anything that can be on the path to the project success? List all potential risks, giving a description |
| and type (direct or indirect). See <a class="elementLinkWithType" href="./../../../openup_basic/guidances/concepts/risk,_0bsLgMlgEdmt3adZL5Dmdw.html" guid="_0bsLgMlgEdmt3adZL5Dmdw">Concept: Risk</a>&nbsp;for more information.</sectionDescription> |
| </sections> |
| <sections xmi:id="_5RiSkDe2EduD7J48kKN20g" name="Are risks described without ambiguity" guid="_5RiSkDe2EduD7J48kKN20g"> |
| <sectionDescription>Make sure you capture and describe risks in a clear, concise and unambiguous way. Also follow these rules when describing |
| mitigation strategies for risks. This will avoid unnecessary work and - more importantly -&nbsp;that a risks are |
| effectively identified and managed.</sectionDescription> |
| </sections> |
| <sections xmi:id="_2rpQoDIfEduDTv4Y1akVTA" name="What is the probability of happening and impact of each risk" guid="_2rpQoDIfEduDTv4Y1akVTA"> |
| <sectionDescription>Determine&nbsp;the probability of the risk happening and its impact on the project. This gives you the order of magnitude |
| of risks (probability x impact), allowing you to address the high magnitude risks early in the project. See <a class="elementLinkWithType" href="./../../../openup_basic/guidances/concepts/risk,_0bsLgMlgEdmt3adZL5Dmdw.html" guid="_0bsLgMlgEdmt3adZL5Dmdw">Concept: Risk</a>&nbsp;for more information.</sectionDescription> |
| </sections> |
| <sections xmi:id="_x-gbwDe0EduD7J48kKN20g" name="Have the risks been properly prioritized and sorted" guid="_x-gbwDe0EduD7J48kKN20g"> |
| <sectionDescription>The risk list is a prioritized list with the highest risk at the top and the rest in descending order.&nbsp; They should be |
| sorted according to their magnitude of risk.</sectionDescription> |
| </sections> |
| <sections xmi:id="_hSFaYDe3EduD7J48kKN20g" name="Are there interdependencies between risks" guid="_hSFaYDe3EduD7J48kKN20g"> |
| <sectionDescription><p class="MsoNormal" style="MARGIN: 0in 0in 0pt"> |
| <span style="FONT-SIZE: 10pt; FONT-FAMILY: Arial">Make sure you establish interdependencies between risks as |
| appropriate. For example, the consequence of a risk happening may raise the probability of another risk happening, or |
| raise the impact that other risk brings to the project. If risks depend on each other, you may need to |
| mitigate&nbsp;all interdependent risks&nbsp;at the same time, or revisit the risk list to update the magnitude of |
| dependent risks.</span> |
| </p></sectionDescription> |
| </sections> |
| <sections xmi:id="_LATHgDIeEduDTv4Y1akVTA" name="Is there a mitigation strategy for each risk" guid="_LATHgDIeEduDTv4Y1akVTA"> |
| <sectionDescription><p> |
| Propose a mitigation strategy for each identified risk. You can either transfer the risk, avoid it, accept it or |
| mitigate it (by minimizing the probability&nbsp;of happening or impact&nbsp;that the risk brings to the project). See |
| <a class="elementLinkWithType" href="./../../../openup_basic/guidances/concepts/risk_management,_VNxL4ACsEdu8m4dIntu6jA.html" guid="_VNxL4ACsEdu8m4dIntu6jA">Concept: Risk Management</a> for more information. |
| </p></sectionDescription> |
| </sections> |