| <org.eclipse.epf.uma:TaskDescription xmi:version="2.0" xmlns:xmi="http://www.omg.org/XMI" xmlns:org.eclipse.epf.uma="http://www.eclipse.org/epf/uma/1.0.3/uma.ecore" epf:version="1.0.0" xmi:id="_Wk7noKe1EdmGSrcKGOYDGg" name="plan_iteration,_0keUEMlgEdmt3adZL5Dmdw" guid="_Wk7noKe1EdmGSrcKGOYDGg" changeDate="2006-09-07T19:29:53.219-0400"> |
| <sections xmi:id="_CtKCMMBHEdqSgKaj2SZBmg" name="Define the iteration objectives" guid="_CtKCMMBHEdqSgKaj2SZBmg"> |
| <sectionDescription><p> |
| At the beginning of an iteration, the <a class="elementLinkWithType" href="./../../openup_basic/roles/project_manager,_0a0o0MlgEdmt3adZL5Dmdw.html" guid="_0a0o0MlgEdmt3adZL5Dmdw">Role: Project Manager</a>&nbsp;works with the team to define 1-5 objectives. These objectives should be a refinement of the |
| iteration objectives found in the <a class="elementLinkWithType" href="./../../openup_basic/workproducts/project_plan,_0a6vcMlgEdmt3adZL5Dmdw.html" guid="_0a6vcMlgEdmt3adZL5Dmdw">Artifact: Project Plan</a>, and should provide high-level direction to what should be |
| targeted for the iteration. The objectives should be driven based on <a class="elementLinkWithType" href="./../../openup_basic/roles/stakeholder,_dTa6gMAYEdqX-s4mWhkyqQ.html" guid="_dTa6gMAYEdqX-s4mWhkyqQ">Role: Stakeholder</a>&nbsp;priorities, and&nbsp;will be revised as the iteration plan is finalized. The objectives are |
| usually defined as high-level capabilities or scenarios that need to be implemented and tested during the |
| iteration.<br /> |
| </p></sectionDescription> |
| </sections> |
| <sections xmi:id="_307v0MMsEdmdo9HxCRR_Gw" name="Produce detailed plan" guid="_307v0MMsEdmdo9HxCRR_Gw"> |
| <sectionDescription>The <a class="elementLinkWithType" href="./../../openup_basic/roles/project_manager,_0a0o0MlgEdmt3adZL5Dmdw.html" guid="_0a0o0MlgEdmt3adZL5Dmdw">Role: Project Manager</a> works with the rest of the team, and especially the project |
| stakeholders,&nbsp;to identify the high-priority work items from the <a class="elementLinkWithType" href="./../../openup_basic/workproducts/work_items_list,_rGNWsCbSEdqh1LYUOGRh2A.html" guid="_rGNWsCbSEdqh1LYUOGRh2A">Artifact: Work Items List</a> to be addressed within the iteration. The high-level |
| objectives provide guidance on what work items should be considered. The team should break down work items so they fit |
| within the iteration as necessary. Actual effort to complete each Work Item should be estimated. When a team has decided to |
| take on a Work Item, it will assign the work to one or several team members. Ideally, this is done by team members signing |
| up to do the work, since this makes people motivated and committed to doing the job, but based on culture, you may instead |
| have the project manager assign the work.</sectionDescription> |
| </sections> |
| <sections xmi:id="_7Hqr4MMsEdmdo9HxCRR_Gw" name="Define evaluation criteria" guid="_7Hqr4MMsEdmdo9HxCRR_Gw"> |
| <sectionDescription><p> |
| Each iteration should include testing as a part of the evaluation, and the test objectives and test cases needs to be |
| detailed. Other evaluation criteria may include successful demonstrations to key stakeholders, or favorable usage by a |
| small group of target users.<br /> |
| </p></sectionDescription> |
| </sections> |
| <purpose><p class="MsoNormal" style="MARGIN: 0in 0in 0pt"> |
| Develop a fine-grained plan for a single iteration, identifying the goals and evaluation criteria of an iteration |
| (usually the next one). |
| </p></purpose> |