blob: 0da86da1a39b838aec0702005bbd1b5ed54b4184 [file] [log] [blame]
<html>
<head>
<title>WTP PMC Minutes for May 15, 2006 Conference Call</title>
</head>
<body alink="#ff0000" bgcolor="#ffffff" link="#0000ee" text="#000000" vlink="#551a8b">
<table border="0" cellpadding="2" cellspacing="5" width="100%">
<tbody><tr>
<td colspan="2" align="left" bgcolor="#0080c0" valign="top"><b>
<font color="#ffffff" face="Arial,Helvetica">PMC Conference Call - May 15, 2006</font></b></td>
</tr>
</tbody></table>
<table border="0" cellpadding="2" cellspacing="5" width="100%">
<tbody><tr>
<td>
PMC Members Attending:
Tim Wagner [TW],
David Williams [DW],
Raghunathan Srinivasan [RS],
Arthur Ryman [AR],
Jochen Krause [JK],
Naci Dai [ND]
<P>PMC Member Regrets: none
<P>Invited Guests: Neil Hauge [NH]
<P>Others:
Lawrence Mandel [LM]
<!--NOT PRESENT ON THIS CALL:
-->
<h1>WTP PMC Minutes for May 15, 2006 Conference Call</h1>
<h2>Community Update [LM] </h2>
<ul>
<li>J1 update will happen next week (currently going on)
<!-- <li>RSS feed being tested; planned to go live along with Phoenix conversion. -->
</ul>
<h2>Procedural [TW] </h2>
<ul>
<li>Dali slidedeck review (review will occur 5/24)
<li>IP status update with Janet last week, log will be finalized this week for review
<li>WTP release review - see email request to component leads/community to gather needed
information. Slide deck must be returned to EMO this Friday for consolidation into
overall Callisto release review.
<li>JSF and Dali release reviews - need to schedule with Bjorn in preparation for
coordinated technology
</ul>
<h2>Requirements [JK] </h2>
<ul>
<li>Jochen notified the PMC that he will be stepping down from his PMC role post
the 1.5 release.
<li>One more session likely needed to finalize planning document (2-3 weeks).
<li>DTP server "exploration" (querying of running server) view. Would be
a good area to coordinate and possibly merge with DTP, but no resources
are currently identified.
</ul>
<h2>1.0.3 </h2>
<ul>
<li>Some bugs still need review
<li>Builds will start again this week
</ul>
<h2>Callisto / 1.5 / RC3 Status </h2>
<ul>
<li>Status: due to produce RC3 this Friday
<li>1.5 / 2.0 interop: will update requirements document wording and discuss with team on
Thursday status call.
</ul>
<h2>JSF Status [RS] </h2>
<ul>
<li>Build test successful
<li>Feature complete targeted for 6/7
<li>Snippets icon contribution - need to verify with Janet that there's still time to
incorporate this for June 30 release
</ul>
<h2>Dali Status [NH] </h2>
<ul>
<li>Milestone 3 (based on RC2) posted over the weekend; final iteration now
in progress
<li>Feature freeze still targeting 6/4
</ul>
<h2>Support Tools [AR] </h2>
<ul>
<li>Option file patch made available to help with debugging (tool is end-user
visible, and would assist them in diagnosis and information gathering)
<li>Ultimate resting place should be the platform, but might "incubate" in WTP
(especially since there are WTP-specific elements to the functionality)
<li>Please evaluate off-line; will resume discussion of inclusion next week
</ul>
<h2>Action Items </h2>
<ul>
<li>[TW] IP log updated and readied for internal review
<li>[AR] Set up Wiki page for internal reviews / Arthur and Tim to locate previous
internal review criteria (for JSF and Dali)
<li>[TW] Contact Bjorn for external release review dates for JSF and Dali
<li>[TW] Update wiki interop language
</ul>
<small>Minutes taken by Tim Wagner, May 15, 2006. Please notify me of any corrections needed.
</small>
</tr>
</tbody></table>
</html>