blob: 473c3f064d3a0e33c0d43360e27175bfb4beb6e8 [file] [log] [blame]
<html>
<head>
<title>WTP PMC Minutes for August 15, 2006 Conference Call</title>
</head>
<body alink="#ff0000" bgcolor="#ffffff" link="#0000ee" text="#000000" vlink="#551a8b">
<table border="0" cellpadding="2" cellspacing="5" width="100%">
<tbody><tr>
<td colspan="2" align="left" bgcolor="#0080c0" valign="top"><b>
<font color="#ffffff" face="Arial,Helvetica">PMC Conference Call - August 15, 2006</font></b></td>
</tr>
</tbody></table>
<table border="0" cellpadding="2" cellspacing="5" width="100%">
<tbody><tr>
<td>
PMC Members Attending:
Tim Wagner [TW],
David Williams [DW],
Raghunathan Srinivasan [RS]
<P>PMC Member Regrets: Jochen, Naci
<P>Invited Guests: Robert Goodman (ATF),
Neil Hauge (Dali)
<P>Others:
Lawrence Mandel [LM]
<h1>WTP PMC Minutes for August 15, 2006 Conference Call</h1>
<h2>Community [LM] </h2>
<ul>
<li>Tim and Lawrence continuing to look for website supporters - support from member companies,
advertising on the WTP website, etc.
<li>Planning continues for Eclipse Summit Europe.
</ul>
<h2>Process [TW] </h2>
<ul>
<li>Dali and JSF 0.5 release paperwork has been completed and this issue closed.
<li>Instantiations researching open source project EULA; no new information to report.
<li>Committer permission review continues; new spreadsheet received from Sharon Corbett.
Four committers removed (see next item), plus ongoing corrections for sub-project leads.
<li>Inactive committer update: Four committers resigned of the six we attempted communication
with. One we have been unable to contact so far, the other expressed some interest in future
involvement.
</ul>
<h2>Requirements and Planning [TW] </h2>
<ul>
<li><a href="http://wiki.eclipse.org/index.php/WTP_and_STP_Collaboration">WTP/STP Collaboration Wiki</a> created.
<li>Next stage in requirements and planning will likely occur the first / second week of September;
this will include additional detail from component leads as well as an open community requirements call.
<li>Sybase visual editor code has been deposited into Bugzilla. Tim to follow up with Sybase on
creation and staffing of component to support and integrate this code drop.
</ul>
<h2>1.5.1 and 2.0 Status [DW] </h2>
<ul>
<li>1.5.1 builds ok. Rampdown plan included in agenda and will be distributed to wider WTP team.
<li>Plugin ranges still being adjusted for 2.0; no successful build yet for 3.3 base. Ongoing push
for accuracy here (including a reflection of where non-APIs are required.)
</ul>
<h2>JSF Status [RS] </h2>
<ul>
<li>0.5.1 to be released using the WTP 1.5.1 rampdown schedule.
<li>Still gathering requirements for 2.0 release.
</ul>
<h2>Dali Status [NH] </h2>
<ul>
<li>0.5.1 plans TBD based on community feedback regarding critical or blocking issues.
<li>Executing to plan from last month's planning cycle.
<li>Ongoing conversation with JDT UI and Core on annotation support.
</ul>
<h2>ATF Status [RG] </h2>
<ul>
<li>ATF internal review as part of planning process. Next minor release targeting end of August
or beginning of September.
<li>Complaints about installation (particularly the large number of 3rd party dependencies
and the difficulty of getting those) are leading to a request to redistribute these
dependencies as part of the ATF distribution. These will be shared with other Eclipse projects
where that makes sense.
<li>Ongoing discussions with 3rd parties who may be able to cooperate, including student interns
possibly interested in ATF.
</ul>
<h2>Action Items and Owners </h2>
<ul>
<li>Tim to follow up with Sybase on visual editor contribution and staffing plans for it.
<li>Tim to post 1.5.1 rampdown to dev group, Wiki, and project metadata.
<li>Tim to continue working with Sharon Corbett on permissions review and policy adherence.
</ul>
<small>Minutes taken by Tim Wagner, August 15, 2006. Please notify me of any corrections needed.
Amended 8/22/2006 to correct date in title.
</small>
</tr>
</tbody></table>
</html>