| <html><head><title>Some Projects Have Outgoing Changes</title> |
| <LINK REL=STYLESHEET HREF=../book.css CHARSET=ISO-8859-1 TYPE=text/css> |
| <meta NAME="keywords" content=""> |
| <meta NAME="since" content=""> |
| </head><h2>Some Projects Have Outgoing Changes</h2> |
| <p>Since: <br> |
| Last Modified: $Date: 2004/03/23 19:11:08 $</p><body> |
| |
| <h3>Precondition:</h3><ol> |
| <li>Project1, project2 and project3 were released with tag "V4"</li> |
| <li>Project1 and project2 have outgoing changes</li> |
| <li>Project3 doesn't have outgoing changes</li> |
| <li>Map project is committed</li> |
| </ol> |
| <h3>Test Steps:</h3><ol> |
| <li>Start wizard</li> |
| <li>Check project1, project2 and project3</li> |
| <li>Make sure "Release only the changed projects" unchecked</li> |
| <li>Click next</li> |
| <li>Answer yes to project1</li> |
| <li>Answer no to project2</li> |
| <li>Enter tag "v5"</li> |
| <li>Make sure "Move tag if it already exists" unchecked</li> |
| <li>Make sure "Validate release" checked</li> |
| <li>Make sure "Show me the proposed change then commit map file"</li> |
| <li>Click next</li> |
| <li>Click next</li> |
| <li>Comment as "all have outgoing change release some" </li> |
| <li>Click finish</li> |
| <li>Click ok</li> |
| </ol> |
| <h3>Expected Results:</h3><ol> |
| <li>Step 4: Message dialog appear </li> |
| <li>Step6: Enter Tag page shows up</li> |
| <li>Step 11: Compare Tag Files page shows that map1.map and map2.map have proposed changes</li> |
| <li>Step 14: Validation dialog shows that project1 has changes between local and new released version</li> |
| <li>Step 16: Wizard finishes. And (a) project1 and project3 are tagged as v5 in local map files, project2 is still tagged as v4; (b) map project is committed; (c) No difference will be found by comparing local and repository map project; (d) Project1has differences when comparing local and v5 in repository version</li> |
| </ol> |
| |
| |
| </body></html> |